Leyden Gateway

Northwest Arvada, Colorado · Next to Leyden Rock

Leyden Gateway

A proposed mixed-use neighborhood on about 37 acres at Indiana Street and Highway 72: for-sale attached homes, small-scale neighborhood retail, and trail-connected open space designed to blend with Leyden Rock.

~36.7 acFive listed parcels (A1–A5)
210–310For-sale attached and paired homes
~45,000 sfNeighborhood retail and medical
$5.6M–$10.1MTrunk and off-site infrastructure (est.)
Foothills /open space SH-93 Leyden Rock 1,800 homes · 17+ mi trails Candelas Whisper Creek& Five Parks Indiana St Hwy 72 Jefferson Pkwy (reserved) LEYDENGATEWAY Existing retail pads N
Context diagram, not to scale. Gateway site (clay) fronts Indiana St east of Leyden Rock.

Presentation sections

Path to approval

  1. Pre-applicationMonths 0–2
  2. Due diligenceMonths 1–5
  3. Community outreachMonths 3–7
  4. Council study sessionMonths 6–8
  5. Formal applicationMonths 8–11
  6. Planning Commission & CouncilMonths 11–15

Leyden Gateway

Investor Overview

We recommend assembling about 37 acres of listed land at Indiana Street and Highway 72, next to Leyden Rock in northwest Arvada, for a mixed-use neighborhood of for-sale attached homes and neighborhood retail. Figures are planning-level and need a market study, title work and engineering before any commitment.

The opportunity

Leyden Rock is a 1,500-acre master-planned community with 1,800 homes in northwest Arvada, and its homes average about $925,000 and $286 per square foot. Retail has not kept up: brokers market the last pads at 86th Parkway and Indiana Street as serving Five Parks, Whisper Creek, Leyden Rock and Candelas in an under-served trade area with limited competition.

The area also sits inside the 2,032-acre Northwest Arvada Urban Renewal Area, where AURA budgeted $25 million for 2026. Tax-increment support for public infrastructure is worth testing early.

Candidate sites

Acreage, zoning and prices come from public listings and assessor pages as of late 2026. Ownership, availability and exact boundaries still need title work. Site IDs match the GIS layers.

ID Site Acres Zoning / use Asking price Status
A1 8473 Indiana St 8.23 Residential land $4.5M ($546,780/ac) Active
A2 8661 Indiana St (APN 20-251-01-006) 9.22 Development land $4.0M Under contract
A3 APN 20-251-01-007 3.67 (6.05 also shown) Industrial-general Not listed Owner TBD
A4 SWC Indiana St & Hwy 72 13.23 Mixed use Unpriced Active
A5 15330 Colorado 72 2.32 GC, City of Arvada $895,000 Confirm
B1 88th Ave near SH-93 45.29 Allows commercial On request Active
C1 City Leyden Pit land 40 (of 360) City-owned, post-mining Partnership City-controlled
D1 SEC W 90th Ave & Indiana 0.89–11.07 Retail On request Active

A1 through A5 make up the Gateway assemblage, about 36.7 acres. A2 being under contract is the first thing to resolve: approach its buyer about a joint venture or take-out, or plan the project without it.

Concept program

The working concept on the 36.7-acre Gateway is 210 to 310 for-sale homes plus about 45,000 square feet of neighborhood retail. That suits Arvada's Mixed-Use Suburban (MX-S) district and the Northwest Arvada sub-area corridor along Indiana Street.

INDIANA ST Village green Detention pond Corner shopsLive-work For-sale homesTrail link toLeyden Rock S RI Emergency access toward Hwy 72
Shops / caféLive-workHomesGreenPondS signal · RI right-in/right-out
Illustrative concept plan for discussion. Not a site plan; layout follows due diligence and staff input.

About 37 acres total.

Component Land (ac) Program Notes
For-sale attached and paired homes ~26 210 units at 8/ac, up to 310 units at 12/ac Priced below Leyden Rock's ~$925K average; targets move-down buyers and young families
Neighborhood retail / medical pads ~6 ~45,000 sf Fronts Indiana St at the signalized entry
Open space, trails, detention, ROW ~5 Pond, trail link to Leyden Rock's trail system Water-wise landscaping required by state law

Income-restricted or attainable units are worth offering voluntarily. Council has focused on Proposition 123 affordable-housing commitments in 2026, and a share of attainable units strengthens the case at hearings.

Neighborhood retail options

The retail should be small-scale and residential in character, placed on the Indiana St edge so traffic stays off Leyden Rock streets. Mixing formats spreads lease-up risk, and a temporary market can prove demand before anything is built.

Shopfront townhomesShop below, home above
Village green shopsCoffee, bakery, market
Trailhead commonsCafé and bike stop
Barn marketFood hall, later phase
House-form officesDentist, vet, childcare
Farmers marketWeekend pop-up, year 1
Option Scale Typical tenants Investor angle
Shopfront townhomes (live-work) 12–20 units, ~400–800 sf shop each Salon, studio, tailor, small office Sold as for-sale homes, so no retail lease-up risk; small price premium
Village green corner shops 3–4 buildings, 2,000–4,000 sf each Coffee, bakery, small market, pharmacy counter Anchors the project's identity; lease or sell pads
Trailhead commons 1,500–2,500 sf + pavilion Café, ice cream, bike repair Draws trail users from 17+ miles of trails; low parking need
Barn / farmstead market 6,000–10,000 sf Small food hall, farm stand, events Highest upside and highest operating risk; later phase
House-form office pads 2,500–5,000 sf each Dentist, vet, childcare, physical therapy Stable daytime tenants; common build-to-suit deals
Temporary market / food trucks Retail pad, weekends Farmers market, trucks Near-zero capital; tests demand and builds support

Suggested phasing: temporary market in year 1, then the village green and shopfront townhomes with Phase 1 homes, then office pads, with the barn market last.

Illustrative economics

At asking prices and 8 homes per acre the deal is thin, with about a 5% finished-lot margin. It works at 12 per acre or with land negotiated near $350,000 per acre, where margins run 15–26%. These are horizontal (land-development) scenarios: buy, entitle, build infrastructure, then sell finished lots to builders.

Illustrative finished-lot margin. Land price and density matter more than anything else.
Scenario Land cost Homes Land / home Cost / finished lot Est. lot value Margin
Asking ~$450K/ac, 8/ac $16.5M 208 $56,250 $151,250 $159,500 ~5%
Asking ~$450K/ac, 12/ac $16.5M 312 $37,500 $117,500 $137,500 ~17%
Negotiated ~$350K/ac, 8/ac $12.8M 208 $43,750 $138,750 $159,500 ~15%
Negotiated ~$350K/ac, 12/ac $12.8M 312 $29,167 $109,167 $137,500 ~26%

Assumptions (all to be replaced by a market study and engineer's estimate): 26 of 36.7 acres residential. Horizontal cost per lot is $80,000 at 8/ac and $65,000 at 12/ac, plus $15,000 soft cost. Finished-lot value is 22% of the home price ($725,000 paired, $625,000 townhome). Retail-pad revenue is excluded and is upside.

Key risks

Act first Likelihood → Impact → Council hearingLand control (A2)Wildfire evacuationWater / droughtOld coal mineJefferson Pkwy
Relative ranking by the project team for discussion, not a scored risk model.
Risk Why it matters Mitigation
Council hearing outcome Arvada's mixed-use code makes some uses conditional, which means a public hearing. In April 2026 Council denied a 384-apartment / 51-townhome CUP at Welby Gardens Lead with for-sale product, do early neighborhood outreach, offer attainable units, and secure staff support before filing
Wildfire evacuation Residents have told Council that Highway 72 is the sole evacuation corridor for growing west-Arvada development Second emergency access, evacuation analysis, WUI building standards
Land control A2 is under contract and A4 is unpriced Options or LOIs with due-diligence periods; phase around gaps
Old coal mine The Leyden coal mine was room-and-pillar mined 790–855 ft down and later used for gas storage until 2001. Arvada now uses it for water storage Geotechnical and mine-subsidence study before purchase; strongest concern for SA-3 and anything west of the townsite
Water supply Arvada declared Stage 1 drought in April 2026 Water-efficient design; confirm tap availability in writing early
Jefferson Parkway Communities like Leyden Rock were built around the reserved alignment. Its timing is uncertain Avoid the corridor; treat it as upside for access, not as a dependency

Leyden Gateway

Infrastructure Memo for City Planning

The recommended Leyden Gateway site (SA-1, about 37 acres at Indiana Street and Highway 72) needs an estimated $5.6M–$10.1M of trunk and off-site work. That covers a looped 12-inch water main, gravity sewer to Indiana Street, Xcel gas and electric extensions, a regional detention pond, and a signalized access. All locations are schematic and are offered for staff to correct against City utility GIS.

Schematic map of candidate sites, study areas and proposed utility improvements
Schematic only. Locations approximate (WGS84); verify against City utility GIS, county parcels and Colorado 811.

Service providers

WaterCity of Arvada
SewerArvada → Metro Water Recovery
GasXcel Energy
ElectricXcel (United Power near foothills)
StormwaterArvada + Mile High Flood District
AccessCDOT on CO 72 / Arvada
FireArvada Fire
TelecomComcast, Lumen
Utility Provider Notes
Water City of Arvada Utilities 75% from Denver Water's North System, 25% Arvada's own Clear Creek and Ralston Creek rights; Stage 1 drought declared April 2026
Wastewater City of Arvada collection; treatment by Metro Water Recovery All Arvada wastewater is treated at Metro Water Recovery
Natural gas Xcel Energy Main extensions designed by Xcel
Electric Xcel Energy (likely); United Power near the foothills United Power's territory reaches the foothills west of Arvada. Confirm the boundary for SA-2
Stormwater City of Arvada; Mile High Flood District Leyden Creek Major Drainageway Plan governs the receiving drainage
Highway access CDOT where frontage is on CO 72 (confirm which Indiana St segments are state highway) State Highway Access Code permit; the City co-reviews
Fire / emergency Arvada Fire Fire flow, apparatus access, second access
Telecom Comcast, Lumen, others Joint trench with electric

SA-1 Gateway improvements

IDs match the proposed_utility_lines and proposed_utility_points GIS layers. Lengths are measured from the schematic geometry. Costs are planning-level 2026 Front Range unit costs, ±50%.

Planning-level ranges (±50%). Items shown total about $5.6M–$10.1M; gas is extra (Xcel allowance).
ID Utility Improvement Size Length Est. cost
W-1 Water Frontage main along the west side of Indiana St, tied in at both ends as a loop 12" ~2,840 ft $0.85M–$1.28M
W-2 Water Two internal east–west distribution loops 8" ~2,410 ft $0.48M–$0.72M
SS-1 Sanitary sewer Internal gravity collector, south then east to the existing Indiana St sewer 8" ~3,570 ft $0.89M–$1.43M
G-1 Natural gas Frontage extension with service stubs; possible regulator station (G-P1) Xcel design ~2,840 ft Xcel allowance / contribution in aid of construction
E-1 Electric Underground primary feeder loop; switchgear for retail (E-P1) 3-phase ~3,770 ft $0.38M–$0.75M
ST-1 Stormwater Trunk storm sewer to the regional pond 24"–36" RCP ~2,660 ft $0.80M–$1.33M
ST-P1 Stormwater Full-spectrum detention and water-quality pond, SW corner — — $0.60M–$1.20M
ST-2 Stormwater Pond outfall toward the Leyden Creek drainage; ditch-crossing agreements likely — ~1,100 ft $0.15M–$0.35M
T-1 Transportation Signalized full-movement entry plus a right-in/right-out, with turn lanes — — $1.2M–$2.5M
T-2 Emergency access Secondary access toward the Hwy 72 west leg 26 ft min. ~850 ft $0.20M–$0.40M
C-1 Telecom Joint-trench conduit 2 × 4" ~2,840 ft $0.06M–$0.11M
Total, excluding gas $5.6M–$10.1M

Internal local streets, lot services and street lighting are not included. They are normally designed with the preliminary plat.

Neighborhood retail: site design and utility needs

The retail program is small-scale and neighborhood-serving: shopfront townhomes (live-work), a village green with 3–4 corner shops, a trailhead café, house-form office pads, and later possibly a barn-style market. It sits on the Indiana St frontage so retail traffic stays off Leyden Rock's local streets.

Topic What the retail adds Planning ask
Zoning Small neighborhood scale Consider MX-N Mixed-Use, Neighborhood for the retail portion instead of MX-S
Water Commercial meters and fire sprinklers for food uses Size W-1 / W-2 for commercial fire flow
Sewer Grease from café and food-hall uses Grease interceptors on SS-1 laterals
Electric / gas Three-phase service for kitchens Covered by switchgear point E-P1
Stormwater More impervious parking area Include in pond ST-P1 sizing; permeable pavers in parking
Building form 1–1.5 stories, pitched roofs, under ~10,000 sf each Neighborhood design standards
Parking Behind or beside buildings; shared with trail users Shared-parking analysis
Lighting and signs Dark-sky fixtures, dimming after close; monument signs only Conditions of approval
Operations No drive-throughs facing homes; set delivery and trash hours Conditions of approval
Connectivity Trail link and walking path to Leyden Rock Dedicated trail easement

Alternate sites SA-2 and SA-3

Both alternates need long off-site runs and probably lift stations, so their trunk costs per acre are higher than SA-1's.

ID Site Improvement Length Est. cost
W-3 SA-2 Leyden West (88th Ave near SH-93) 12" water main east to the existing system; possible pressure zone / PRV ~3,560 ft $1.07M–$1.60M
SS-2 + SS-P2 SA-2 On-site lift station and 6" force main east to gravity ~3,560 ft $0.53M–$0.89M + $1.5M–$3.0M
G-2 SA-2 Gas main extension ~3,560 ft Xcel allowance
E-2 SA-2 Primary extension; confirm Xcel vs United Power ~3,560 ft $0.36M–$0.71M
T-3 SA-2 SH-93 / Hwy 72 access, CDOT permit, auxiliary lanes — $1.0M–$2.0M
ST-P2 SA-2 Detention / water-quality pond — $0.50M–$1.00M
SS-3 SA-3 Leyden Pit (City land) Lift station and force main toward the Leyden Rock system ~3,920 ft $2.09M–$3.98M
W-4 SA-3 12" water connection ~3,920 ft $1.17M–$1.76M

SA-3 also needs geotechnical work on reclaimed pit fill, coordination with the DRMS reclamation permit M-1983-139 (which reserves 14.5 acres for the Jefferson Parkway footprint), and a mine-subsidence review because of the old Leyden coal workings.

GIS package

The layers come in three formats, all in WGS84 (EPSG:4326): zipped shapefiles, GeoJSON, and one GeoPackage. Each feature carries its ID, provider, size, cost range, priority and an accuracy note.

Layer Geometry Contents
candidate_sites Point Sites A1–A5, B1, C1, D1–D3 plus context points; acres, zoning, price, status, source
study_areas_constraints Polygon SA-1, SA-2, SA-3 study areas; CZ-1 approximate coal-mine review zone
proposed_utility_lines Line W, SS, G, E, ST, T, C improvements
proposed_utility_points Point Pond, lift station, switchgear, regulator, signal and access points
constraint_lines Line Approximate Jefferson Parkway reserved corridor
  1. ArcGIS Online: Content → New item → upload Leyden_Gateway_Shapefiles.zip (or each .geojson) → Create a hosted feature layer → add it to a map over the City's utility layers.
  2. ArcGIS Pro: Add Data → Leyden_Gateway_Infrastructure.gpkg → add all five layers. Symbolize proposed_utility_lines by the utility field.
  3. Correct the geometry: snap lines to the actual mains and replace study-area boxes with assessor parcel polygons.

The study-area boxes are not parcel lines, and the coal-mine zone and parkway corridor are illustrative. Replace them with Jefferson County parcels, Colorado Geological Survey mine maps and the JPPHA alignment.

Data requests and studies

From the City

By the applicant

Leyden Gateway

Proposal to the City Manager

We ask the City Manager to designate a staff project lead and convene a pre-application team for a roughly 37-acre mixed-use neighborhood at Indiana Street and Highway 72, so that a complete application can reach Planning Commission and City Council in about 12 to 15 months.

Requests

  1. A staff project lead in Community & Economic Development, plus a pre-application meeting with Planning, Engineering, Utilities, Transportation, Arvada Fire and the Arvada Urban Renewal Authority within 45 days.
  2. Early written utility capacity feedback on water, fire flow and sewer for the Indiana St / Hwy 72 corridor, so engineering can be sized correctly.
  3. Direction on the right zoning path: a rezoning to MX-S with a conditional use or a planned development, and whether annexation or enclave issues apply to any parcel.
  4. Agreement to explore financing tools: a metropolitan district service plan and an urban-renewal reimbursement agreement in the Northwest Arvada Urban Renewal Area.
  5. A study-session slot on Council's calendar once the concept is refined, before formal filing.

Project summary

Leyden Gateway assembles five listed parcels, about 36.7 acres, on the west side of Indiana Street near Highway 72. The concept is 210–310 for-sale attached and paired homes, about 45,000 sf of neighborhood retail and medical space, and about 5 acres of open space and regional detention.

Foothills /open space SH-93 Leyden Rock 1,800 homes · 17+ mi trails Candelas Whisper Creek& Five Parks Indiana St Hwy 72 Jefferson Pkwy (reserved) LEYDENGATEWAY Existing retail pads N
Context diagram, not to scale. Gateway site (clay) fronts Indiana St east of Leyden Rock.
City plan or goal How the project fits
Northwest Arvada Sub-Area Plan (Indiana St corridor, Phase 1) Mixed use on the corridor the plan targets
2020 Land Development Code mixed-use districts Uses the MX-S Mixed-Use Suburban district
Housing and Proposition 123 commitments Adds attainable for-sale product; offers an income-restricted share
Retail service for northwest Arvada Brokers describe the trade area as under-served
Wildfire and emergency preparedness Second access, hardened construction, support for Leyden-area evacuation planning

A concept map, candidate-site table and schematic infrastructure plan are included, with GIS files ready for the City's ArcGIS environment.

Public benefits offered

InfrastructureLooped water main, signal, regional pond
SafetySecond emergency route + evacuation study
Attainable homesTarget 10% at ≤120% AMI
Retail & jobsSales tax and daily needs nearby
TrailsLink to Leyden Rock's network

Neighborhood retail

Leyden Rock residents currently drive for daily needs. The Gateway would add small, unobtrusive shops at the neighborhood's edge, built to match its stone-and-stucco character.

Next steps

The target is a Council hearing about 12–15 months after the pre-application meeting. Each phase gates the next.

036912151. Pre-application2. Due diligence3. Community outreach4. Council study session5. Formal application6. Planning Commission & CouncilMonths from pre-application
Target schedule. Phases overlap; each one gates the next.
Phase Months Key work Gate to move on
1. Pre-application 0–2 Staff team meeting; utility capacity data; zoning-path direction; land LOIs and options Staff confirms the zoning path and utility feasibility
2. Due diligence 1–5 Survey and title, Phase I ESA, geotech and mine study, traffic study, drainage concept, will-serve letters No fatal flaws; land under contract
3. Community outreach 3–7 Meetings with Leyden Rock Metro District, Candelas and Whisper Creek residents, and Arvada Fire Concept revised to respond to comments
4. Council study session 6–8 Concept, public benefits, financing tools Informal Council direction
5. Formal application 8–11 Rezoning / conditional use, preliminary plat and development plan, metro district service plan, AURA agreement term sheet Staff report recommends approval
6. Planning Commission & Council 11–15 Public hearings; first and second readings of ordinances Approval with conditions

After approval: final plat, development agreement, CDOT access permit, construction drawings and permits. First home deliveries would likely come 12–18 months after that.

Issues for early staff direction

Leyden Gateway

Draft Proposal to Arvada City Council

DRAFT for discussion. It assumes the City Planner and City Manager have reviewed the project and support bringing it forward. The applicant asks Council to approve zoning, a preliminary development plan, a metropolitan district service plan and an urban-renewal agreement for Leyden Gateway: about 37 acres at Indiana Street and Highway 72 with 210–310 for-sale homes and about 45,000 sf of neighborhood retail.

Actions requested of Council

Final application types and ordinance numbers will be confirmed by staff.

  1. Staff reviewComplete application
  2. Planning CommissionHearing + recommendation
  3. Council – 1st readingOrdinances introduced
  4. Council – 2nd readingPublic hearing + vote
  5. AgreementsDevelopment, metro district, AURA
  1. Ordinance (first and second reading): rezone the Gateway parcels to MX-S Mixed-Use Suburban, or a planned development if staff recommends it, with annexation of any unincorporated parcel.
  2. Conditional use permit, if staff determines that attached residential or any proposed use is conditional in MX-S.
  3. Preliminary development plan and preliminary plat.
  4. Resolution: approve the Leyden Gateway Metropolitan District service plan, limited to public improvements, with a debt cap and mill-levy cap.
  5. Resolution: approve an agreement with the Arvada Urban Renewal Authority for tax-increment reimbursement of eligible public improvements in the Northwest Arvada Urban Renewal Area.
  6. Development agreement: infrastructure obligations, phasing, attainable-housing commitment and emergency access.

Project description

INDIANA ST Village green Detention pond Corner shopsLive-work For-sale homesTrail link toLeyden Rock S RI Emergency access toward Hwy 72
Shops / caféLive-workHomesGreenPondS signal · RI right-in/right-out
Illustrative concept plan for discussion. Not a site plan; layout follows due diligence and staff input.
Item Proposal
Location West side of Indiana St near Highway 72, northwest Arvada, next to Leyden Rock and Whisper Creek
Site About 36.7 acres across five parcels (A1–A5 in the GIS layers)
Homes 210–310 for-sale attached and paired homes (8–12 units/ac on ~26 ac)
Commercial ~45,000 sf neighborhood retail and medical on ~6 ac fronting Indiana St
Open space ~5 ac: regional detention, trail links, water-wise landscaping
Access Signalized full-movement entry and a right-in/right-out on Indiana St; secondary emergency access toward Hwy 72
Utilities Arvada water and sewer (Metro Water Recovery treatment); Xcel gas and electric
Public infrastructure Est. $5.6M–$10.1M trunk and off-site (water, sewer, storm, power, signal)
Phasing Phase 1: Indiana St frontage, signal, retail pads, first ~100 homes. Phase 2: remaining homes

Public benefits and proposed conditions

The applicant proposes that these commitments be written into the development agreement as conditions of approval.

  1. Build the looped 12" water main, sewer, regional detention pond and Indiana St signal before the first certificate of occupancy for Phase 1.
  2. Build the secondary emergency access before more than 100 homes are occupied. Fund an evacuation analysis coordinated with Arvada Fire and the Leyden Emergency Preparedness Study.
  3. Price at least 10% of homes for households at or below 120% of area median income, with deed restrictions. Final percentage and term to be negotiated.
  4. Meet the City's adopted wildfire and WUI construction standards for every building.
  5. Limit metro-district debt and mill levy to service-plan caps. Disclose the district to every buyer before contract.
  6. Dedicate a trail connection to the Leyden Rock trail system and keep the Jefferson Parkway reserved corridor free of buildings.
  7. Use water-wise landscaping only, with no nonfunctional turf in commercial, common or right-of-way areas.

Neighborhood retail and design standards

The commercial component is neighborhood-scale retail designed to blend with Leyden Rock, not a shopping center. It would be built in phases: a temporary farmers market first, then a village green with corner shops and shopfront townhomes with Phase 1, then house-form office pads, and possibly a barn-style market later.

The applicant proposes these retail design standards as additional conditions of approval:

  1. Retail buildings are 1–1.5 stories with pitched roofs, no larger than about 10,000 sf each, using stone, stucco and wood that match the adjacent neighborhood.
  2. Parking sits behind or beside buildings and is screened with landscaping. No parking lot faces Indiana St frontage between buildings.
  3. No drive-through facing a residential lot.
  4. Monument signs only, no pylons. Dark-sky lighting dimmed to security levels one hour after closing.
  5. Deliveries and trash collection limited to set daytime hours.
  6. A landscaped buffer and a public walking path connect the shops to Leyden Rock's trails.

Staff may recommend MX-N Mixed-Use, Neighborhood zoning for the retail portion to lock in this scale.

Code and ordinance issues

Four issues could stop or reshape the project: the conditional-use hearing, wildfire code, CDOT access spacing, and the fire code's second-access rule. All should be settled with staff before filing. Code citations are to be confirmed by the City Attorney and staff against the current Arvada Municipal Code and Land Development Code.

Severity Code / law Potential issue Proposed response
High Arvada LDC use regulations: conditional uses Conditional uses go to a public hearing. Council denied a 384-apartment / 51-townhome CUP at Welby Gardens in April 2026 For-sale product, lower density near Leyden Rock, early outreach, attainable units
High Colorado Wildfire Resiliency Code (SB23-166; 8 CCR 1507-39) WUI jurisdictions had to adopt by April 1, 2026; HB26-1334 proposed a one-year extension. Hardening and defensible-space rules add cost Design to the code now; confirm the City's adopted version and the site's hazard rating
High CDOT State Highway Access Code (on CO 72 segments) Access spacing may limit full-movement entries and signals Early CDOT meeting; traffic study; shared access with neighbors
High International Fire Code as adopted by Arvada (Appendix D, if adopted) Subdivisions above about 30 homes generally need two separate fire-apparatus access roads Secondary access (T-2) built before the 100th home, or earlier if Arvada Fire requires
Medium SB24-005 nonfunctional turf ban No nonfunctional or artificial turf in new commercial and common-interest areas; local ordinances due January 1, 2026 Native and water-wise landscaping in all common areas
Medium Metropolitan district service plan (C.R.S. Title 32) and City review Debt and mill-levy caps, buyer disclosure, public scrutiny of metro districts Single-purpose district, capped debt and mills, full disclosure
Medium Urban renewal (C.R.S. 31-25) and AURA agreement Tax-increment reimbursement needs AURA board and Council approval and affects other taxing entities Reimburse only public improvements; performance-based
Medium Annexation (C.R.S. 31-12) Any unincorporated parcel needs annexation and zoning before or with the rezoning Confirm the jurisdiction of each parcel at pre-application
Medium Stormwater criteria; Leyden Creek master plan; irrigation-ditch rights Full-spectrum detention; ditch crossings need the ditch company's consent Regional pond; early contact with ditch companies
Medium Geologic hazards: old Leyden coal mine Subsidence can occur long after a mine closes Geotech and mine study; Colorado Geological Survey referral
Medium Water and sewer system development fees; drought Fee cost and tap availability under Stage 1 drought Will-serve letter; water-efficient fixtures and landscaping
Medium Park and school land dedication Land or fee in lieu for parks and Jeffco Public Schools Credit for trails and open space; fee in lieu for schools
Low State housing laws (e.g., HB24-1152 accessory dwelling units) HOA covenants cannot ban ADUs where state law allows them Draft covenants to comply
Low Jefferson Parkway reserved corridor Communities have been built around the alignment Keep buildings out of the corridor; coordinate with JPPHA

Review and approval criteria

This draft assumes the City Planner has found the application complete and consistent with the Comprehensive Plan and the Northwest Arvada Sub-Area Plan. It also assumes the City Manager supports bringing it forward with the conditions above, and that Planning Commission will recommend approval before Council.

For each approval, Council would find that the project:

  1. Is consistent with the Comprehensive Plan and the sub-area plan for the Indiana St corridor.
  2. Meets the LDC's rezoning, conditional-use and subdivision criteria, including compatibility with Leyden Rock and Whisper Creek.
  3. Is adequately served by water, sewer, drainage, fire protection and transportation, or will be through the conditions.
  4. Mitigates wildfire, evacuation and geologic hazards.
  5. Provides public benefits proportionate to any metro district or urban-renewal assistance.

Exhibits to attach: concept site plan, the schematic infrastructure map and GIS layers, traffic study, preliminary drainage report, geotech and mine study, metro district service plan, AURA term sheet, and an outreach summary.

Leyden Gateway

Neighborhood Retail – Street Front Concept

Shopfront townhomes, a village green with corner shops, and a trailhead stop along the Indiana Street edge. Buildings are 1 to 2 stories with pitched roofs, in the stone, stucco and timber of Leyden Rock.

STUDIO SALON TAILOR COFFEE · BAKERY MARKET TRAILHEAD
Conceptual street elevation – not to scale, for discussion.

Shopfront townhomes

Owner lives above a 400–800 sf ground-floor studio. Reads as housing from the street.

Corner café and market

Porch seating faces a paseo of street trees. Each building 2,000–4,000 sf.

Village green

Benches and shade trees, with room for a weekend farmers market on the lawn.

Trailhead pavilion

Bike racks, a repair stand and restrooms where the trail meets Leyden Rock's network.

Design standards proposed as conditions of approval

1–1.5 stories, pitched roofsUnder ~10,000 sf per buildingStone, stucco and timberParking behind or beside buildingsNo drive-throughs facing homesMonument signs onlyDark-sky lighting, dimmed after closeDaytime delivery and trash hoursTrail link to Leyden Rock

Leyden Gateway

Cost Estimates by Phase and Party

Developer capital for Leyden Gateway runs about $33.8M–$56.1M across pre-development, land and two build phases, plus $1.8M–$4.0M if the barn market is built. The City puts in no capital under this proposal; public financing (metro district and urban renewal) repays part of the public infrastructure over time.

$33.8M–$56.1MDeveloper capital, all core phases
$33.2M–$42.9MFinished-lot sales to builders (208–312 lots)
$5.0M–$10.0MMetro district bonds (illustrative capacity)
$0City capital required as proposed
Developer cost range by phase. Bars show low–high estimate.

Cost by phase

1. Pre-development Months 0–15: studies, design, entitlements

ItemEstimate
Studies, design, legal, fees (+10% contingency)$790K–$1.5M
Phase total$790K–$1.5M

2. Land acquisition At or after approval; options/LOIs earlier

ItemEstimate
Gateway parcels A1–A5 (~36.7 ac)$12.8M–$16.5M
Phase total$12.8M–$16.5M

3. Phase 1 build Frontage, trunk utilities, ~100 homes, village green

ItemEstimate
Trunk and off-site infrastructure (SA-1)$5.6M–$10.1M
Internal streets and lot services, 100 lots$3.5M–$5.0M
Engineering, financing and soft costs$1.2M–$1.8M
Village green shops (~12,000 sf)$4.2M–$5.4M
Trailhead pavilion and green$400K–$800K
Phase total$14.9M–$23.1M

4. Phase 2 build Remaining 108–212 homes, office pads

ItemEstimate
Internal streets and lot services, 108–212 lots$3.8M–$10.6M
Engineering, financing and soft costs$1.3M–$3.8M
Office pad preparation (buildings by pad buyers)$200K–$500K
Phase total$5.3M–$14.9M

5. Later (optional) Barn / farmstead market

ItemEstimate
Barn market building (6,000–10,000 sf)$1.8M–$4.0M
Phase total$1.8M–$4.0M

Who pays what, by party

Investors / developer

PhaseCost or contributionNotes
Pre-development$790K–$1.5MAt risk until approvals; the main equity exposure
Land acquisition$12.8M–$16.5MOptions and LOIs first; close after approval
Phase 1 build$14.9M–$23.1MIncludes all trunk infrastructure and village green shops
Phase 2 build$5.3M–$14.9MFunded largely from Phase 1 lot sales
Offsets$33.2M–$42.9M lot sales; $5.0M–$10.0M metro district reimbursementPlus retail pad sales or leases; AURA reimbursement TBD

City of Arvada (planner, manager, council)

PhaseCost or contributionNotes
Pre-developmentStaff review timeCovered by application and review fees
Land / Phase 1 / Phase 2$0 capital as proposedDeveloper builds; City accepts public streets, water and sewer
Long termMaintenance of accepted infrastructureOffset by utility rates, sales and use tax, property tax
OptionalOversizing share, if the City wants larger mainsReimbursed by agreement; TBD

Metro district and Arvada Urban Renewal Authority

PhaseCost or contributionNotes
Phase 1–2$5.0M–$10.0M bond capacity (illustrative)Repaid by a capped mill levy on homeowners; sized by a financial advisor
Phase 1–2Tax-increment reimbursement: TBDNegotiated with AURA for eligible public improvements only
ApprovalService plan and agreementBoth need City Council approval

Utilities and CDOT

PhaseCost or contributionNotes
Phase 1Xcel gas and electric extensionsXcel construction allowance offsets part; developer pays the rest as contribution in aid of construction
Phase 1CDOT access permitNo CDOT capital; developer builds signal and turn lanes ($1.2M–$2.5M, in trunk)
OngoingArvada water and sewerSystem development fees collected at building permit

Builders and homebuyers

PhaseCost or contributionNotes
Phase 1–2Finished lotsAbout $137,500–$159,500 per lot, per the investor scenarios
Phase 1–2Home construction, permits, water/sewer system development feesPer builder budgets and the current City fee schedule
OngoingMetro district mill levy and HOA duesDisclosed to every buyer before contract

Basis of estimate